MTR underground station entrance shaft.
Shaft depth: 33m
Construction period: April - June 2015
Nishimatsu Construction Co. Ltd
As the contractor was required to complete the station entrance within 4 months, a proven self-climbing system was required with the following features:
Easy to use, with only unskilled labour
Self-climbing, as very limited crane time available
Fast and reliable
Able to meet the tight programme requirement of 4 months to complete
Technical Supervisor ensured a swift, trouble-free start-up
Single-sided, VARIO GT24 formwork & special single-lift platform system.The system was designed to be supported by only 4 No. wall anchors.
One set of RCS hydraulics was provided, capable of lifting 28t at a speed of 1.0m/min with all loads carried by only the 4 No. wall anchors.