You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

South Health Campus, Canada

項目數據

地點: Calgary, 加拿大

Medical centre with 644 beds south of Calgary

200,000 m² floor space

Shell construction time of main building: 2007-2011
(whole campus will be finished in 2018)

要求

Special requirements concerning slab dimensions, construction time and construction sequence

客戶

Ellis Don, Calgary, Canada

客戶的利益

  • shuttering of a slab area of 2,800 m² per week
  • no shoring measures necessary for the lower storeys
  • easy and fast moving process
  • special solution saves 30-40% of work time
  • only 4 instead of 6 construction cranes
Scott Thompson, Project leader and Sam Poskovic, Foreman
Scott Thompson | Sam Poskovic
Project leader | Foreman

The PERI solution helps us to save 30 - 40 % of work effort so that we are able to work very efficiently. What is more, we only need four instead of the six cranes that were originally planned.

派利方案

  • 57 special tables with 90 m², based on standard components with only 4 corner supports without intermediate supports
  • load transfer via existing reinforced concrete columns
  • DCS system (deflection compensating system) automatically compensates for the deflections occurring during pouring
  • special transportation trolleys for easy and fast manual moving in vertical and horizontal directions