Golden Ears Bridge, Canada
項目數據
地點: Vancouver, 加拿大
Cable-stayed bridge over the Fraser River
Length: 976 m
Longest span: 244 m
Pylon heights: 86 m
Start of works: 2006
Opening for traffic: 2009
要求
Four H-shaped pylons with continually changing cross sections and extremely high wind loads.
客戶
Bilfinger Berger Inc., Vancouver
客戶的利益
Construction time reduced by regular weekly cycle and climbing not dependent on cranes.
I have already been working with PERI systems for many years and I am convinced that the ACS Climbing System and the VARIO Wall Formwork are the optimum solution. ACS enabled us to reduce the build time. In my opinion PERI offers the best formwork systems in terms of technology.
派利方案
- climbing formwork solution for pylons without crane support with concreting cycle heights of 4 m
- climbing platforms positioned lengthwise with mobile formwork elements on rollers for the front ends