Der Neue Zollhof (The New Zollhof), Germany

項目數據

地點: Düsseldorf, 德國

Extraordinary group of buildings within the cultural and media mile along the Rhine harbour in Düsseldorf. The three blocks of houses, which are up to 55 m high, consist of reinforced concrete bodies that are moved into each other and warped.

Construction period: 1996-1998

Architect: Frank O. Gehry

要求

Unique building geometry out of doubly curved free-form surfaces

客戶

Philipp Holzmann Bauprojekt AG

客戶的利益

  • complex building geometry shuttered with system parts
Werner Meyer, Main foreman, Der Neue Zollhof
Werner Meyer
Main foreman

For this extraordinary building, an enormous degree of expertise and flexibility on the spot is required.

派利方案

  • slab formwork solution with SKYDECK, filler areas with triangular frames and filler units supports
  • TRIO as base for the support of the CNC-milled polystyrene moulds
  • inclined column formwork with RAPID, adjustment via wedges