CB Climbing Formwork in action
-
A robust system
Providing high-load capacity and generous working space
Project: Oval Village
-
Save crane time and stay on programme
Robust units with minimal components allow the platform and formwork to be elevated in only one crane lift
Project: Newington 87 Causeway
-
A safe and hazard-free working environment at height
Working in and around the formwork system is safe thanks to the spacious platforms and open and clear working deck
Project: Cardiff University
Additional information
Variations
CB 240 Climbing Formwork bracket width 2.40m with carriage (75cm retraction distance), strongback and an adjustable brace
CB 160 Climbing Formwork bracket width 1.60m with adjusting unit, strongback and adjustable brace
Interested in using CB Climbing Formwork for your project?
We will tailor the most optimal solution to meet your specific requirements.